DIRECTORY PAGE CS Roofing - Job Task Analysis Form CS Roofing - Job Task Analysis Form Job * Completed By * Date completed * Job Size * Small Large (includes job summary details) Job Summary Details Detailed Job Description * Project/Site: * CS Roofing H&S Manager Name * CS Roofing H&S Manager Cell CS Roofing H&S Manager Phone CS Roofing H&S Manager Email Site Supervisor Name Site Supervisor Cell Site Supervisor Phone Site Supervisor Email Site Foreman Name Site Foreman Cell Site Foreman Phone Site Foreman Email PPE Required * *Hard hats, Safety glasses, Hi-Vis, Gloves, safety footwear, Soft-soled shoes for on roof work** *Hard hat is only required on the roofing area if there is overhead works being carried out. ** Please refer to the usage of PPE as per controls set out in the plan Plant Required Crane CS Roofing Canterbury/ Calder Stewart Slings and strops, lifting bar CS Roofing Canterbury/ Dimond Knuckle Boom CS Roofing Canterbury Scissor lifts- all-terrain CS Roofing Canterbury/ Total Access Signage Required Site to be taped off to prevent unauthorised personnel access to areas where they could be hit by falling materials, tools or equipment. Job Task Analysis Step * Task * Attach edge protection – hand rail system Attaching Lifting slings around roofing material. Attaching roofing materials using portable electric tools. Delivery of Materials on site Installation of Ceilings and or Soffits Installation of clear sheets Installation of Tray wall cladding - via scaffold Installing safety Net Installing Wall Cladding on a Commercial Building - Sheets over 9m Laying of bats, netting, paper and iron Laying of foil and battens Laying of the Roof at Night – Working under Lights Manual handling of roofing and or wall cladding materials Materials being stock-piled on roof area. Positioning of Crane and material delivery vehicle. Removal of commercial roof Roofing lifted and maneuvered by crane into position Securing Safety mesh Securing Safety Mesh using the netting machine. Worker positioning and fixing insulated wall panels using Cladboy Worker positioning and fixing wall cladding Sheets Under 9m Workers Gaining Access to the roof work area Workers installing Flashings, rainwater heads, spouting, downpipes, and doing finishing work Workers installing Wall cladding using Scaffold Workers positioning and fixing roofing. (Fall Off Scaffold) Workers positioning and fixing roofing. (Fall Off) Workers positioning and fixing roofing. (Fall Through) Workers positioning Insulated Roof panels using Cladboy. Working in Fall Protection System: Fall Restraint or Fall Arrest (If Required) Working in outside weather conditions Hazards * [350 Character Max Entry] Controls * [600 Character Max Entry] Responsible Person/s plus1 Add minus1 Remove Send copy to third party? * No Yes Copied to: Email plus1 Add minus1 Remove If you are human, leave this field blank. Submit