A1 Wrap - Job Task Analysis Form A1 Wrap - Job Task Analysis Form Job Description * Project/ Site * Completed by * Date Job Safety Analysis completed * PPE required * Hi Viz Clothing, Safety Boots, Safety Climbing Helmet, Harness/Lanyard, Safety Glasses, Welding Gloves Plant required * Gas Bottles, Shrink Guns, Fire Extinguishers, Ropes, Rescue Kit, Safety Knives, White Spirits, Drills, Screws, First Aid Kits Job Task Analysis Step * Select a stepVisual Assess site/scaffold structureProtectionInstalling WrapWeld WrapShrinking WrapShrink Wrap RemovalSeal/ Batten WrapOther Step Hazards * 1. Unsecure Scaffold 2. Void Areas 3. Obstructions around wrap and scaffold areas Controls * *Stop work until secured *Report to PCBU Supervisor *Ensure Scaffold Tag up to date and tagged safe *Ensure sole boards are on a level surface Hazards * 1. Protruding/Sharp Scaffold Points 2. Working at Heights Controls * *Harnesses used and must be clipped on using double-action clips *Staff are trained *All PPE gear has current Test & Tag Hazards * 1. Working at Heights 2. Adverse Weather 3. Slip/Trip/Fall 4. Manual Handling 5. Falling Materials/Items Controls * *Harnesses used & clipped on using double-action clips *Staff are trained *All PPE gear is current Test & Tag *Ensure wind is below 10km/ph & clamped onto the scaffold *Over 10km/ph winds stop the install *Keep scaffold clear of clutter *Appropriate workboots are worn for the job *Correct PPE to be worn *Correct lifting/pulling technique used *Heavier than 25kg must work in teams Hazards * 1. Burns 2. Fire 3. Gases/Fumes Controls * *Ensure correct use of welding gloves are used *No loose clothing *First aid kits at the site *Staff trained in the use of equipment *Hot Works permits issued *Fire extinguishers are located on each working level *Avoid overheating concentrated areas *Remove any debris that could ignite *Avoid working in confined spaces & ensure good ventilation *Equipment has current certification for use *Remove any leaking gas bottles immediately Hazards * 1. Burns 2. Fire 3. Gases/Fumes Controls * *Ensure correct use of welding gloves are used *No loose clothing *First aid kits at the site *Staff trained in the use of equipment *Hot Works permits issued *Fire extinguishers are located on each working level *Avoid overheating concentrated areas *Remove any debris that could ignite *Avoid working in confined spaces & ensure good ventilation *Equipment has current certification for use *Remove any leaking gas bottles immediately Hazards * 1. Working at Heights 2. Adverse Weather 3. Slip/Trip/Fall 4. Manual Handling 5. Falling Materials/Items 6. Insecure Loads 7. Asbestos Contaminated Wrap Controls * *Harnesses clipped on using double-action clips *Staff are trained *Gear is current Test & Tag *Wind is below 10km/ph and clamped onto the scaffold. If over 10km/ph winds install is stopped *Scaffold is kept clear of clutter & correct PPE is worn *Correct lifting/pulling technique used *Heavier than 25kg must work in teams *Use trailer strops on every load with a safety net over goods on trailers *Decon wash processes set out in the ARCP is used *Asbestos only removed once approved by a certified Asbestos contractor Hazards * 1. Use of hand tools 2. Manual handling Controls * * Current test & tag * Staff trained * Correct PPE used Hazards * Controls * plus1 Add minus1 Remove Copied to: Email plus1 Add minus1 Remove If you are human, leave this field blank. Submit